NVIDIA OpenShell for Linux contains a vulnerability in resource-level authorization for create, read, update, and delete operations where an authenticated remote attacker with low privileges could access or modify resources without the required authorization checks
Source GCVE Database
Not known to be exploited · CVSS 8.1 High.
Data as of 17 Nov 2026, 19:49 UTC
Thin evidence
One scorer or none| CNA (nvidia) | CVSS 3.1 | 8.1 |
|---|
CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:U/C:H/I:H/A:NExploitation evidence
Disclosed: evidence found.
CVE published 17 Nov 2026
Detectable: no evidence on record.
No public nuclei template indexed
Weaponized: no evidence on record.
No public exploit code indexed in Metasploit or Exploit-DB
Exploited in the wildExploited: no evidence on record.
Not in CISA KEV and no source reports exploitation
Observed by OffSeq MirageSeen by Mirage: no evidence on record.
No attack traffic recorded by OffSeq Mirage sensors
A missing step is not evidence of safety. Sources: cve.org (opens in a new tab), the Metasploit, Exploit-DB and nuclei-templates index as of 16 Nov 2026.
What to do
Affected software
| Product | Affected | Fixed in |
|---|---|---|
| NVIDIAOpenShell | Affected
| Fixed in– |
GitHubnvidia/OpenShellpkg:github/nvidia/OpenShellOther threats | Affected
| Fixed in– |
Check your own hosts for these packages with threat-finder (opens in a new tab), our free open-source scanner.
Description
NVIDIA OpenShell for Linux contains a vulnerability in resource-level authorization for create, read, update, and delete operations where an authenticated remote attacker with low privileges could access or modify resources without the required authorization checks. A successful exploit of this vulnerability might lead to information disclosure and data tampering.